NQA (V&V)
對PWR結構的V&V
Problem 19:Lotung Experiment for a Reduced-Scale Embedded RB Model Subjected to Ground Shaking
觀測點(1)
節點302的加速度響應曲譜(5%阻尼)
Lotung的試驗, LSST07, EW方向,
蒸氣發生裝置(F4SGU)的試驗記錄與計算結果比較
觀測點(2)
節點300的加速度響應曲譜(5%阻尼)
Lotungの実験, LSST07, EW方向,
蒸氣發生裝置(F4SGL)的試驗記錄與計算結果比較
PROBLEM 9:PWR REACTOR BUILDING (RB) STRUCTURE SUBJECTED TO COHERENT AND
INCOHERENT SEISMIC MOTIONS
PROBLEM 36:DEEPLY EMBEDDED CYLINDER RESPONSE USING FLEXIBLE VOLUME AND
FLEXIBLE INTERFACE METHODS
Copyright © 2013 Terrabyte (Shanghai) Co.,Ltd.